GolfVectorLab
Simulator Planning

Simulator Build Sequencer

Follow a fixed, explainable stage order, measure, layout, impact zone, components, budget, installation, test, so irreversible decisions come first.

  1. Measure the room
  2. Choose a layout(blocked)
  3. Define screen and impact zone(blocked)
  4. Verify component requirements(blocked)
  5. Set budget(blocked)
  6. Plan installation(blocked)
  7. Install and test(blocked)

Next stage

Measure the room

Rule-derived

Your next stage is "Measure the room".

Tradeoffs to weigh

  • Skipping ahead of an irreversible stage (like finalizing the layout before measuring) risks rework the sequence is designed to prevent.
  • This fixed order trades flexibility for safety: it will not suggest working out of order even if you believe your situation is an exception.

Assumptions

  • The dependency order (measure, layout, impact zone, components, budget, installation, test) is a fixed, general-purpose sequence, not customized to your specific build.
  • Completion state and any notes you add are tracked only in this browser.

Limitations

  • This is not contractor, electrical, structural, or installation code advice.
  • It tracks sequence and completion only; it does not verify that a stage was done correctly.

Why order matters more than it seems

It is tempting to start a simulator build by picking exciting equipment: a projector, a launch monitor, a screen brand. But every one of those choices depends on room and layout decisions that are expensive to undo once made. Buying a screen before confirming your room actually fits it, or setting a budget before you know what your impact zone requires, both risk wasted money. This tool encodes a fixed, explainable order that puts irreversible spatial decisions before optional purchases.

The fixed sequence, and why it does not change

Measure the room first, since every later decision depends on real numbers, not estimates. Choose a layout next, since it determines where everything else goes. Define your screen and impact zone before verifying component requirements, since your impact zone constrains which screen sizes and device placements are even possible. Verify component requirements before setting a budget, since you cannot budget accurately for components you have not yet confirmed will fit. Only after budget is set does it make sense to plan installation and finally test and calibrate. This tool will not let you skip ahead of a genuinely blocking prerequisite, even if your specific situation feels like an exception.

What "blocked" and "ready" mean here

A stage is ready when every stage it depends on is marked complete; it is blocked otherwise, and the tool names exactly which prerequisite is missing. Marking a stage complete is your own judgment call, not something this tool verifies independently. This is a personal tracking checklist, not an automated project management system that checks your actual work.

Not contractor or code advice

This sequence describes the order of planning decisions, not how to physically install anything. It does not provide electrical, structural, or building-code guidance for any stage. For actual installation work, especially anything involving electrical circuits or structural changes, consult a qualified professional. Once you are past the room and layout stages, the budget planner and break-even planner support the later stages of this same sequence.

Frequently asked questions

Why measure the room before choosing equipment?

Every later decision, from layout to component sizing, depends on real room numbers, not estimates. Buying a screen before confirming your room fits it risks wasted money — this tool encodes a fixed order that puts irreversible spatial decisions first.

What does a "blocked" stage mean?

A stage is blocked when a stage it depends on is not yet marked complete, and the tool names exactly which prerequisite is missing. It will not let you skip ahead of a genuinely blocking prerequisite.

Does marking a stage "complete" verify my actual work?

No. Marking a stage complete is your own judgment call — this is a personal tracking checklist, not an automated project management system that inspects your real progress.